STAFF INTERVIEW
Kawakami Dam JV Construction Office Managing. Engineer.
Mitsuhiro Omata
As a tendency in the overall construction industry, the decrease in the number of skilled laborers has become noticeable. Skilled technology and know-how are also being lost at dam construction sites, raising concerns about a decline in productivity. For the countermeasure for these issues, system development to improve productivity and ensure quality has become an issue.
At Kawakami Dam, we are advancing the automation of construction technology (labor saving and efficiency improvement), and the development by concentrating all of Obayashi's efforts to more than 20 technological developments aiming to raise to a practical level. For example, "automation of tower cranes linked to concrete placing systems", "judgment and evaluation of concrete placement joint surface processing using AI", "complete precasting of inspection galleries" etc., new attempts on both hardware and software are made.
Obayashi Corporation aims to dramatically improve productivity by establishing “ODICT”, which integrates the dam construction technology it has cultivated up to now with innovative construction technology such as ICT and AI.
Automation of construction machinery does not currently provide automatic control like self-driving cars, and it is still in the testing stage.
For automation, it is necessary to digitize the contents that have been instructed by written instruction or verbal until now. Ambiguous instructions and judgments will not work.
It is extremely difficult to review existing methods and visualize the necessary information.
However, to solve the problems faced by the construction industry, new technologies are proactively used, and next-generation construction technologies are developed, the challenge of automating dam sites positively through trial and error aims to be continued.
Construction title: The Kawakami Dam Construction work
Construction site: Aho area, Iga city, Mie pref.
Client: Japan Water Agency, Independent administrative agency
Contractor: Obayashi corp., Sato Kogyo Co. and JDC Corp. Specified construction work consortium
Construction Period: Form 2017 Sep.21 to 2023 Mar.31
The future of dam construction and technology as envisioned by Obayashi Corporation
Obayashi Corporation Civil Engineering Technology Division
Dam Technology Department Manager
Katsuhiro Ueko
Message from the person in charge of the construction site
"Professional technologies are accumulated to complete the dam".