Kawakami-dam
A gravity concrete dam and ancillary facilities (inflow water bypass) were constructed upstream of the Kizu River on the Yodo River system in Iga City, Mie Prefecture, to mitigate flood damage and ensure stable water supply. CIM (Construction Information Modeling/Management) was used in an integrated manner in design and construction, and construction automation was achieved by linking with ICT.
Facility type | Dam / Power Plant |
---|---|
Location | Mie,Japan |
Client | Japan Water Agency |
Design | Japan Water Agency |
Completion | March,2023 JV |